Environmental
Batchelor Construction Group recently completed the demolition of the old ABC Transmission Tower at 5 Sandy Bay Road for H.F. Construction Group. The tower was 82m tall and 6.2m wide at the base. All materials were transported to our yard at Kingston and then cut up using our 27-ton excavator with steel sheers. Importantly, 100%…
Read MoreEarlier in October 2023, we started work at the Kermandie sub station working for RBD Electrical. Our works are to install a new oil containment tank and plumbing works, removal of the old concrete bund area and transformer plinth, and installation of the new concrete bund and plinth.
Read MoreThe West Coast Council in Tasmania commissioned Batchelor Construction Group to build a new landfill cell, wetlands, and related infrastructure near Zeehan. The work scope encompassed a three-layer landfill liner system consisting of GCL, HDPE, and Geofabric, along with a new leachate pond, wetland system, and a surface water management system featuring a sediment pond…
Read MorePROJECT: Dulverton Waste Landfill Cell B1 Location: Dulverton, Tasmania Principal : Dulverton Waste Management PROJECT SCOPE: Civil and earthworks associated with landfill cell, including stormwater, leachate drainage. GCL lining installation. Area: Approx. 10,800 sq. mts. Contract Value: $0.9M Project Year: 2017/18 Project Duration: 4 months Contract Type: Contact Sum Unique Compliance: Met EPA Standards for hazardous waste…
Read MorePROJECT: Wetland Treatment System for Landfill Leachate Location: Burnie, Tasmania Principal : Burnie City Council PROJECT SCOPE Civil and earthworks for all leachate ponds, leachate plumbing and reticulation, pump stations and infiltration forest foundation and waterway landscaping. Treating approx. 490kL/day Area: Approx. 28 hectares Contract Value: $2.1M Project Year: 2016/17 Project Duration: 9 months Contract Type:…
Read More