Civil Projects

Anfield Street, Glenorchy – Intersection

May 29, 2025

We’re proud to share the successful completion of the Anfield Street Intersection Treatment for Glenorchy City Council, delivered under the LGAT Procurement Minor and Major Civil Works Panel (LOCAL-1095627).This project focused on improving road safety and pedestrian access along Grove Road through a range of upgrades.The completed works aim to reduce vehicle speeds and enhance…

Read More

Tods Corner – Central Highlands

May 29, 2025

Concrete repairs to the flume walls for Hydro Tasmania—an important piece of infrastructure originally installed in the 1960s. Our scope of works included the removal of any damaged concrete cutting approximately 300mm below the affected areas to ensure a solid base. This was achieved using ultra high-pressure water blasting, which allowed us to leave the…

Read More

Claremont Link Road

May 28, 2025

Rehabilitation of a landslip-affected area along an approximately 90-metre section of the eastern batter of the Brooker Highway, located at the Claremont Link Road Interchange. Works included stabilisation of the embankment, earthworks to restore structural integrity, and implementation of erosion control measures to ensure long-term safety and resilience of the roadway infrastructure.

Read More

Kings Quarter Subdivision – Kingston, Tasmania

August 26, 2024

This subdivision allowed for 88 Lot high intensity living housing. Works included main civils and drainage, lot connections, asphalt & concrete curbing of roads.

Read More

Clarence City Council – Stormwater Upgrade, Wisteria Avenue, Cremorne, Tasmania

July 29, 2024

Batchelor Construction Group has recently completed a project for the Clarence City Council, involving the upgrade of a stormwater main on Wisteria Avenue, Cremorne. The main works involved a stormwater upgrade and pavement reseal.  

Read More

Simplot Australia – Mt Joy Potato Storage Facility- Civil Works

July 17, 2024

The Batchelor Construction Group was commissioned by Simplot Aust. to undertake the civil works for a new potato storage facility in the Northern Midlands. The works were completed in two phases, with the bulk earthworks of approximately 150,000 tons of cut and fill, and 10,000 tons of quarry materials placed on the site with the…

Read More

Waratah Wynyard Council – Stormwater Upgrade

July 17, 2024

Batchelor Construction Group has recently completed a project for the Waratah-Wynyard Council, involving the upgrade of a stormwater main on Bowick Street, Wynyard. The work included the demolition and removal of existing fences, gardens, and pavement, as well as the old stormwater line and manholes. These were replaced with DN900 Stormpro pipes, laid at a…

Read More

Clarence City Council – Geilston Bay Foreshore Improvements

July 17, 2024

The project called for the demolition of an existing boardwalk, reshaping the existing  batter and placement of a new rock breakwater wall plus the installation of new safety rail and fencing. Located adjacent to the Geilston  Bay Boat Club

Read More

Marine and Safety Tasmania ( MAST) – Upgrade of Penguin Boat Ramp

July 17, 2024

The upgrade called for an extension of the boat ramp by another 15 metres to cater for the launch and recovery of watercraft at low tides.

Read More

McConnell Dowell – Bridgewater Bridge

October 16, 2023

The Batchelor Construction Group team are proud to be involved in Tasmania’s largest transport infrastructure project, the New Bridgewater Bridge. Working for McConnell Dowell we have had up to 35 plant items including nine excavators ranging from 8 to 50 ton, dozers, graders, and trucks on site, each working up to 55 hours every week.

Read More