Civil Projects
We’re proud to share the successful completion of the Anfield Street Intersection Treatment for Glenorchy City Council, delivered under the LGAT Procurement Minor and Major Civil Works Panel (LOCAL-1095627).This project focused on improving road safety and pedestrian access along Grove Road through a range of upgrades.The completed works aim to reduce vehicle speeds and enhance…
Read MoreConcrete repairs to the flume walls for Hydro Tasmania—an important piece of infrastructure originally installed in the 1960s. Our scope of works included the removal of any damaged concrete cutting approximately 300mm below the affected areas to ensure a solid base. This was achieved using ultra high-pressure water blasting, which allowed us to leave the…
Read MoreRehabilitation of a landslip-affected area along an approximately 90-metre section of the eastern batter of the Brooker Highway, located at the Claremont Link Road Interchange. Works included stabilisation of the embankment, earthworks to restore structural integrity, and implementation of erosion control measures to ensure long-term safety and resilience of the roadway infrastructure.
Read MoreThis subdivision allowed for 88 Lot high intensity living housing. Works included main civils and drainage, lot connections, asphalt & concrete curbing of roads.
Read MoreBatchelor Construction Group has recently completed a project for the Clarence City Council, involving the upgrade of a stormwater main on Wisteria Avenue, Cremorne. The main works involved a stormwater upgrade and pavement reseal.
Read MoreThe Batchelor Construction Group was commissioned by Simplot Aust. to undertake the civil works for a new potato storage facility in the Northern Midlands. The works were completed in two phases, with the bulk earthworks of approximately 150,000 tons of cut and fill, and 10,000 tons of quarry materials placed on the site with the…
Read MoreBatchelor Construction Group has recently completed a project for the Waratah-Wynyard Council, involving the upgrade of a stormwater main on Bowick Street, Wynyard. The work included the demolition and removal of existing fences, gardens, and pavement, as well as the old stormwater line and manholes. These were replaced with DN900 Stormpro pipes, laid at a…
Read MoreThe project called for the demolition of an existing boardwalk, reshaping the existing batter and placement of a new rock breakwater wall plus the installation of new safety rail and fencing. Located adjacent to the Geilston Bay Boat Club
Read MoreThe upgrade called for an extension of the boat ramp by another 15 metres to cater for the launch and recovery of watercraft at low tides.
Read MoreThe Batchelor Construction Group team are proud to be involved in Tasmania’s largest transport infrastructure project, the New Bridgewater Bridge. Working for McConnell Dowell we have had up to 35 plant items including nine excavators ranging from 8 to 50 ton, dozers, graders, and trucks on site, each working up to 55 hours every week.
Read More