Project: Restoration and upgrading of seawater intake pipeline at seafood processing plant.

Location: Bicheno, Tasmania

Principal: Craig Moyston Group

Project Scope: Install 100 mt long, 2 x 200mm HDPE intake pipes, including sea floor anchoring. The storm-prone (high wave zone) section included a 20mt long x 800mm HDPE      sleeve, concrete filled, encasing the intake pipes.

Contract Value: $250K

Project Year: 2020

Project Duration: 4 Weeks

Contract Type: Contract Only – Lump Sum