Burnie Fender Replacement

November 10, 2024

Repair damage to existing concrete spacer panels and upgrade existing spacer panels to accommodate a new fender system.

Read More

Montrose Bay – Foreshore Pontoon Gangway

November 10, 2024

Removal of old steel gangway structure demolition of old concrete abutment, construction of new concrete abutment and installation of new aluminum gangway.

Read More

Pawleena Roundabout – Arthur Highway

November 10, 2024

Construction of a roundabout on the current road alignment.

Read More

Burtonia Street, Rokeby – Subdivision

November 10, 2024

Construction of 48 Lot Subdivision for Mission Australia Housing Tasmania.

Read More

Federal Safety Accreditation Received

September 26, 2024

Batchelor Construction Group are proud to achieve accreditation under the Australian Government Building and Construction Work Health and Safety Accreditation Scheme.

Read More

Kings Quarter Subdivision – Kingston, Tasmania

August 26, 2024

This subdivision allowed for 88 Lot high intensity living housing. Works included main civils and drainage, lot connections, asphalt & concrete curbing of roads.

Read More

McConnell Dowell- Bridgewater Bridge – Noise Wall Installation

July 17, 2024

Batchelor Construction Group is proud to continue our relationship with McConnell Dowell with Tasmania’s largest ever transport infrastructure project, the New Bridgewater Bridge. This time with the installation of noise walls. The north side wall required night works and included precast panels installed under live power lines supervised by Tas Networks.

Read More

Waratah Wynyard Council – Stormwater Upgrade

July 17, 2024

Batchelor Construction Group has recently completed a project for the Waratah-Wynyard Council, involving the upgrade of a stormwater main on Bowick Street, Wynyard. The work included the demolition and removal of existing fences, gardens, and pavement, as well as the old stormwater line and manholes. These were replaced with DN900 Stormpro pipes, laid at a…

Read More

Port Latta Substation

July 17, 2024

We are proud to be selected by RBD Electrical for works at the Port Latta Substation. So far, we have finished preparing and pouring concrete for two new high voltage transformers and cable ducting including trenching for the cabling. Throughout this project, we have engaged local companies from the Northwest Coast. CML Utility Services has…

Read More

Clarence City Council – Geilston Bay Foreshore Improvements

July 17, 2024

The project called for the demolition of an existing boardwalk, reshaping the existing  batter and placement of a new rock breakwater wall plus the installation of new safety rail and fencing. Located adjacent to the Geilston  Bay Boat Club

Read More